After Installing Valves for 8 Years, I Have Summarized 20 Precautions for Installing Valves!

  1. When installing valves, it is necessary to clean the inner cavity and sealing surface, ensure that the connecting bolts are evenly tightened, and check whether the packing is tightly compressed.
  2. The valve during installation is in the closed state.
  3. Large scale gate valves and pneumatic control valves should be installed vertically to avoid tilting towards one side due to the heavy weight of the valve core, which may cause leakage.
  4. There is a set of correct installation process standards.
  5. Valves should be installed in the allowed working position, but attention should be paid to the convenience of maintenance and operation.
  6. The installation of the shut-off valve should ensure that the flow direction of the medium is consistent with the arrow marked on the valve body. For valves that are not frequently opened and closed but require strict assurance of no leakage in the closed state, they can be installed in reverse to use the pressure of the medium to make them tightly closed.
  7. When tightening the compression screw, the valve should be in a slightly open position to avoid damaging the sealing surface of the valve top.
  8. Before positioning, low-temperature valves should undergo opening and closing tests in a cold state as much as possible, requiring flexibility and no jamming phenomenon.
  9. Liquid valves should be configured with a 10° inclination angle between the valve stem and the horizontal to prevent liquid from flowing out along the valve stem, and more importantly, to avoid leakage.
  10. After bare cooling, the large air separation tower pre tightens the connecting valve flange once in the cold state to prevent leakage at room temperature but at low temperature.
  11. It is strictly prohibited to climb the valve stem as a scaffold during installation.
  12. After all valves are in place, they should be opened and closed again, and it is qualified if they are flexible and not stuck.
  13. Valves should generally be positioned before pipeline installation. The piping should be natural, and if the position is not correct, it cannot be forcefully pulled to avoid leaving prestress.
  14. Non metallic valves, some are hard and brittle, while others have lower strength. When operating, the opening and closing force should not be too strong, especially not too forceful. Also pay attention to avoiding collisions with objects.
  15. When handling and installing valves, be cautious of accidents such as bumps and scratches.
  16. When using a new valve, do not press the packing too tightly to prevent leakage, in order to avoid excessive pressure on the valve stem, accelerate wear, and make opening and closing difficult.
  17. Before installing the valve, it is necessary to confirm that the valve meets the design requirements and relevant standards.
  18. Before installing the valve, the interior of the pipeline should be cleaned to remove impurities such as iron filings, to prevent foreign objects from entering the valve sealing seat.
  19. High temperature valves are installed at room temperature. After use, as the temperature rises, the bolts expand due to heat, and the gap increases. Therefore, they must be tightened again. This issue needs to be taken into account, otherwise leakage may occur.
  20. When installing valves, it is necessary to confirm whether the flow direction of the medium, installation form, and handwheel position comply with regulations.

The above are the precautions for valve installation, hoping to provide some help to friends in need.